Reel program

Job-site reel cleanout

At the end of a pull, a job site or staging yard is full of empties. We send one truck to clear them: one-way reels bought, worn ones recycled, makers' returnables listed and left. The site is clear before the next trade arrives.

Staging drawing: empty reels standing on edge in rows sorted by flange size, each chocked on both sides, on dunnage boards, with a clear aisle for forklift tines. Aisle 48-inch row 30-inch row Forks Dunnage under every row; a chock either side of each reel; tags facing the aisle.
Reels standing on edge, chocked, on dunnage, sorted by size, with an aisle for forklift tines.

Timed to the job

Empties pile up fastest in the last weeks of a pull, when the site is also at its busiest. The best time to call is a week before the electrical or fibre crew packs up. We book the truck for the day after, and the laydown yard is clear before paving, landscaping or the tenant's move-in.

Long jobs can have two cleanouts: one at the midpoint, one at the end. That keeps the laydown area usable.

Getting the site ready

  • Stand reels on edge, chocked, on dunnage or firm ground.
  • Keep returnable reels in their own row.
  • Leave an aisle for forks, or a path to roll reels to the truck.
  • Put the gate rules, safety orientation and site contact in the request.

The staging guide has a drawing of a good layout.

Big sites

Data-centre campuses, solar arrays and substation jobs can leave hundreds of reels, many of them 60 inches and up. Those are planned as full loads, sometimes over two days, with the right forks and trailers. Send the count by size and photos of each row.

A typical end-of-job day

Picture a warehouse fit-out in Romeoville: forty reels in the truck court, mostly 42 and 48-inch nailed wood, eight bolted reels stencilled by a maker, and six with split flanges after being dropped from a lift. The driver arrives with a flatbed and forks, checks every reel, loads thirty-two for buyback and six for recycling, and photographs the eight returnables standing in their own row.

The superintendent signs nothing on paper; the ticket follows by email.

What a cleanout clears

Every empty wooden reel on the site, of any size, along with broken reels and loose boards from the laydown area. We don't take cable, part-used reels, plastic waste or packaging: those belong with the contractor or the site's waste hauler.

Returnable reels stay. If a maker or a distributor is due to collect them, tell us the date; we leave them standing, listed and marked, and clear everything around them.

Sites we see most

  • Warehouse and distribution fit-outs on I-55, I-80 and I-88.
  • Data-centre campuses in Elk Grove Village and the O'Hare corridor.
  • Substations and line work in ComEd and NIPSCO territory.
  • Transit work on the Far South Side.
  • Solar arrays and battery sites at the edge of the metro.

Questions

How soon can you clear a job site?

Call a week before the crew packs up and we book the truck for the day after. Large sites may take two days.

Do you need a forklift on site?

For reels over about 42 inches, yes, or a clear path to roll them. Tell us what is available and we bring the right truck.

What happens to returnable reels at the site?

They are listed and left in their own row for the maker or the distributor that sold the cable.

Do you take loose boards and broken reels from the laydown area?

Yes, with the rest of the empties. Pile them beside the reels.

Can a cleanout happen at night or on a weekend?

Ask. Most cleanouts run on weekdays, but some sites only allow trucks outside working hours, and we say whether that can be arranged.

Who signs for the cleanout on site?

Whoever the general contractor names: a superintendent, foreman or site manager. Their name and phone go in the request, and the ticket is emailed to them and to whoever booked it.

Reel words on this page

Payoff
The stand or trailer a reel turns on while cable is pulled off it.
Lagging / staves
The boards nailed around the drum, and the protective boards sometimes nailed across the flanges over finished cable.
Returnable reel
A reel its maker expects back, usually stencilled or tagged to say so.
Drum (barrel)
The cylinder between the flanges that the cable winds around.
Traverse
The inside width between the flanges: how wide a layer of cable can be.

Request a pickup or quote

Clearing a job site? Choose sell, then the product and the reel count, and put the site address, gate rules and finish date in the details.

01What do you need?
04Pickup address

We reply by email or phone with which reels we buy, route or recycle, or a price for the reels you want.

Request a pickup Buy reels