Chicago neighbourhoods
Reel pickup in Roseland and Pullman
We pick up empty cable reels in Roseland, Pullman, West Pullman and Riverdale on Chicago's Far South Side. With the CTA Red Line Extension under construction from 95th Street to 130th Street, contractors along that line can clear empties on a set day instead of letting them pile up at a staging lot.
11100 S100 E to 800 E
The Red Line Extension and the reels it leaves
The Red Line Extension runs about 5.6 miles south from 95th Street to 130th Street, with four new stations, new traction power substations and a railyard near 120th Street. A build like that pulls traction power feeders, signal cable and communications cable through every segment, and each pull empties reels. Large traction power reels are often steel or bolted and belong to their maker; signal and fibre reels are frequently plywood with a maker's return program behind them.
The contractors and subcontractors on that line usually stage reels in a fenced lot near the work. We can clear a staging lot on a schedule: one-way reels bought, returnables listed by maker so the project team can file the return, and broken reels recycled. Put the lot's access rules in the work order and we send the right truck.
Roseland and Pullman also have churches, schools and storefronts being repaired or restored, and their electricians use small reels. A pastor or principal with two leftover spools in a boiler room can ask too; we fold those stops into the same southern swing.
Neighbourhood contractors and small lots
Away from the transit work, the reels in Roseland and Pullman come from electrical contractors doing service changes and building rehab, and from warehouse buildings around 111th Street and the Bishop Ford. A shop with ten or twenty empties behind it is exactly the lot a maker program will not touch, since makers want a full truckload of their own brand.
Small lots ride on the Far South Side corridor day with the bigger staging-lot pickups. Next step: count the reels, note the largest flange size, and send a photo of the pile.
Newer buildings near the expressway
Pullman is a national historical park now, and around it, near 111th Street and the Bishop Ford, newer manufacturing and distribution buildings have gone up on old industrial land. New buildings mean fresh electrical fit-outs, and fresh fit-outs leave empties in the truck court: mostly nailed wood, 30 to 48 inches.
A building manager can ask the electrical contractor to leave empties at one dock door, standing on edge. We collect them once the fit-out ends, and any returnable reels are left for their maker with a list of tag numbers.
Pickup notes for the Far South Side
- Staging lots on transit work often require a site safety briefing; tell us and the driver arrives ready.
- Steel reels with a maker's stencil are listed for the maker, never bought or scrapped by us.
- Alley pickups behind a shop are fine for reels up to 48 inches that two people can roll.
Before the truck comes
- Count the reels by flange size, outside edge to outside edge.
- Photograph the stack, plus one tag or stencil up close.
- Stand each reel on edge and chock it; never stack them flat.
- Leave an aisle wide enough for forklift tines, or a clear path to roll.
- Keep maker-tagged returnables in their own row.
What the driver checks on each reel
- Flanges
- Boards whole and flat, not warped, split or cupped.
- Staves
- Lagging mostly intact on the drum, without rot or gaps.
- Arbor hole
- Round and solid, so a spindle or payoff bar fits.
- Drive holes
- Not torn out or elongated by a payoff stand.
- Markings
- Any maker's stencil, returnable tag or reel number.
- Leftovers
- Cable ends, staples and banding removed or noted.
The rest of the Chicago day
Roseland and Pullman shares a run with these stops:
- the Southeast SideCalumet River and the Calumet Industrial Corridor
- HegewischCalumet Industrial Corridor, south end
- Rogers ParkNorth lakefront: Sheridan Road, Clark Street, Howard Street
- Clearing and Garfield RidgeClearing industrial district and the Midway area
Where Roseland and Pullman reels go
- Buyback: one-way wooden reels with sound flanges and staves are paid for at the stop, priced by size and condition.
- Maker take-back: anything tagged or stencilled as returnable is listed for its owner's own collection.
- Recycling: split, rotted or warped reels are broken down, the wood recovered and the hardware separated.
- Resupply: checked reels go on to buyers who need them for rewinding, storage or projects.
Questions from Roseland and Pullman
Can you clear a Red Line Extension staging lot on a schedule?
Yes. A recurring pickup on a set day works well for staging lots. We sort each visit's reels into buyback, maker returns and recycling, and send a list of the returnables by maker so the project team can file them.
Do you buy steel traction power reels?
No. Steel reels almost always belong to the cable maker or the project. We identify them and point you to the owner's return process.
Do you collect reels from new buildings near Pullman?
Yes. Ask the contractor to stage empties at one dock door and send the count; we collect once the fit-out ends.
Reels waiting in Roseland and Pullman?
Tell us the count and the ZIP and pick buy, sell or recycle. We add Roseland and Pullman to the next Chicago day with room on the truck.
Or write to info@chicagowoodenspools.com with the count, flange sizes and a photo of the stack.